For data centre operators & tenants
This page is about the equipment: what typically leaves a data centre, how each type is handled, and where the value and the risk sit. For the project side — sequencing, access, change windows — see the data centre decommissioning page.
Start here
Send the rack elevations or a DCIM export if you have them. If you do not, tell us the rack count and we will plan to capture the inventory at de-rack.
Request a data centre assessmentOur position
A decommissioning plan answers when and in what order. It does not by itself answer what happens to a storage array with forty-eight drive carriers, or to a rack UPS with a battery string, or to a chassis switch whose line cards are worth more than the chassis.
Those are equipment questions, and they determine both the documentation and the commercial outcome. An array reconciled carrier by carrier is a controls artefact; an array counted as 'one unit' is a liability. A UPS declared upfront ships safely; one discovered on the day delays the vehicle.
We treat the inventory as the product of the engagement, not a by-product of it.
Situations
A generation of compute and storage replaced in place, with the outgoing hardware needing to leave the same floor the new hardware is arriving on.
Leaving a suite or cage under the provider's rules — notice period, escort, induction, make-good — with the equipment needing to be out before the contract end date.
A private facility being wound down over months as workloads migrate, with racks emptying in waves rather than all at once.
Dozens of small server rooms across a branch estate, each with a rack or two, retired as infrastructure centralises.
Our approach
Make, model, serial and U position captured at de-rack, rails and accessories recovered with the chassis, internal drives itemised separately.
Controllers, shelves and drive carriers counted against the array configuration. Media handled exactly as your written instruction states.
Line cards, supervisors, optics and transceivers logged with the chassis they came from, so nothing high-value disappears into a general count.
UPS units and battery strings identified at scoping because they change how a load is packed, transported and accepted downstream.
Process
Establish exactly what is being retired, and where it sits.
Move the hardware off your floor without disrupting what stays.
Determine what still has working life, and what does not.
Media handled the way you instruct, recorded line by line.
Keep working hardware working before it becomes material.
Close out end-of-life material through accountable channels.
FAQ
Send the rack elevations or a DCIM export if you have them. If you do not, tell us the rack count and we will plan to capture the inventory at de-rack.